Do-nothing comparison
Environmental Impact Assessment Handbook, Guidance for competent authorities, consultation bodies, and others involved in the Environmental Impact Assessment process in Scotland, published by Historic Environment Scotland and Scottish Natural Heritage in 2018, states that the do-nothing comparison, or in some cases, such as road improvements, the do-minimum comparison: ‘is a projection of the existing data to provide a baseline for comparison to show what changes, if any, would take place if the project did not go ahead, or what the conditions would be on the road, railways, etc., if the project was not undertaken.’
[edit] Related articles on Designing Buildings
Featured articles and news
From Chaucer to Fawlty Towers.
Electrotechnical excellence, now open for entries.
Net zero electricity grids BSRIA guide NZG 5/2024
Outlining the changes needed to transition to net zero.
CIOB Global Student Challenge 2024
Universitas Indonesia wins for second year running.
New project and cultural district described in detail.
The nature of EPCs, crticism and inaccuracies.
History, issues and redesign.
From waste recycling to energy performance the hierchy.
An introduction to WERCS and WEEE responsibilities
Dealing with 2 million tonnes of waste equipment a year.
Global BACS Market: analytics and optimisation
A BSRIA glance at building automation and control systems.
What it is and how to use it.
Types of insulating plaster by binder and insulant.
Investors in People: CIOB achieves gold
Reflecting a commitment to employees and members.
Scratching beneath the surface; a guide to selection.
ECA 2024 Apprentice of the Year Award
Entries open for submission until May 31.
UK gov apprenticeship funding from April 2024
Brief summary the policy paper updated in March.